Have any question ?

+679 997 2897

Blog

Hatchery and Snacks

Hatchery & Snacks

Home > Hatchery & Snacks

Client

Goodman Fielder

location

Suva

budget

$32M

Hatchery & Snacks

project preview

Kaicolo Consultancy was proudly entrusted with the planning, execution, and setup of key infrastructure projects for Goodman Fielder, a prominent name in food production across the Pacific. This comprehensive engagement involved the successful establishment of a modern Snacks production line, an efficient hatchery chick transfer system, and a fully functional hatchery egg room. Each element of the project was designed and executed with a focus on quality, hygiene, scalability, and operational efficiency to meet Goodman Fielder’s long-term growth strategy.

what we do

The Snacks line was a central component of the project, involving the procurement, installation, and commissioning of food processing equipment tailored to meet commercial snack production standards.

Planning

Create new floor plans

managing

Liaising with contractors

Kaicolo Consultancy ensured that all machinery and layout adhered to food safety protocols and industry best practices. From design through to operational testing, the team worked closely with vendors and engineers to deliver a system capable of consistent, high-volume output with room for future expansion. The hatchery chick transfer system required a streamlined approach to managing the delicate movement of day-old chicks from the hatchery to designated rearing areas. Kaicolo Consultancy designed a workflow that optimized animal welfare, minimized stress during transit, and ensured maximum survival rates. Special attention was given to ventilation, transport crate design, and timing coordination—all crucial factors in a successful hatchery operation. 

Additionally, the setup of the hatchery egg room was executed with precision. This facility was built to accommodate proper egg handling, temperature and humidity control, and hygienic storage prior to incubation. The consultancy oversaw the integration of environmental control systems, egg sorting areas, and biosecurity measures to meet strict hatchery standards. This egg room now serves as a vital hub for ensuring the quality and consistency of the hatching process within Goodman Fielder’s poultry operations.

you can dream, we can build

Goodman Fielder Freezer

Freezer Project

Home > Water Treatment Plant

Client

Goodman Fielder

location

Lautoka

budget

$1M

Goodman Fielder Freezer

project preview

Kaicolo Consultancy was proud to oversee and manage the successful execution of an industrial freezer construction project for Goodman Fielder at their Lautoka facility. This initiative was part of Goodman Fielder’s strategic investment to enhance cold storage capacity and ensure optimal preservation of their wide range of food products. The project’s main objective was to deliver a state-of-the-art, energy-efficient freezer unit capable of meeting growing demand while aligning with strict food safety and quality standards.

what we do

From the early planning stages, Kaicolo Consultancy worked closely with Goodman Fielder’s operational and engineering teams to define project specifications, layout requirements, and performance expectations. A full feasibility assessment and site evaluation were conducted to ensure that the new freezer would seamlessly integrate with existing infrastructure. 

Planning

Create new floor plans

managing

Liaising with contractors

Our team led the coordination of architectural design, mechanical and electrical system planning, and compliance reviews to meet industry regulations and safety protocols.

During the construction phase, Kaicolo Consultancy managed all aspects of the project, including contractor selection, procurement of materials, scheduling, and on-site supervision. We ensured that the freezer was built using high-quality insulation panels, reliable refrigeration systems, and robust structural elements to guarantee durability in a tropical climate. Emphasis was placed on energy efficiency and automated temperature controls to reduce long-term operational costs and ensure consistent performance.

The project was delivered on time and within budget, with rigorous quality checks and commissioning protocols in place before handover. The new freezer has significantly improved Goodman Fielder’s storage capacity in Lautoka, reduced product spoilage risk, and contributed to their goal of streamlining supply chain operations. Kaicolo Consultancy is proud to have played a key role in bringing this critical infrastructure project to life, reinforcing our commitment to delivering practical and high-standard engineering solutions across Fiji’s food and logistics sectors.

you can dream, we can build

Water Treatment Plant

Water Treatment Plant

Home > Water Treatment Plant

Client

Goodman Fielder

location

Cola-i-suva

budget

$5M

Goodman Fielder Water treatment Plant

project preview

Kaicolo Consultancy proudly managed the successful execution of a full-scale Water Treatment Plant project for Goodman Fielder, a leading food manufacturer in the Pacific region. This critical infrastructure initiative was designed to meet the growing demand for clean, safe, and reliable water in their industrial operations.

what we do

The project’s scope covered everything from initial feasibility studies and site assessment to full design, procurement, construction, and commissioning of the plant. Kaicolo’s deep understanding of local environmental conditions and compliance requirements played a central role in ensuring the plant’s long-term efficiency and sustainability.

Planning

Create new floor plans

managing

Liaising with contractors

The project began with a thorough assessment of Goodman Fielder’s operational water needs, followed by the selection of cutting-edge water purification technologies suited to the region’s water quality challenges. Kaicolo collaborated closely with engineers, environmental consultants, and regulatory bodies to develop a system that adhered to both international standards and local environmental guidelines.

This included sedimentation, filtration, chemical dosing, and UV disinfection systems to ensure the water met food-grade processing standards. Their proactive risk management approach helped identify potential obstacles early, allowing the team to maintain tight control over timelines and budgets.

During the construction phase, Kaicolo oversaw every detail, from civil works and mechanical installations to electrical setup and control system integration. The consultancy ensured minimal disruption to Goodman Fielder’s ongoing operations while maintaining rigorous safety and quality standards on-site. Local contractors and specialists were engaged and trained under Kaicolo’s supervision, ensuring capacity-building and community involvement in the project. Their experienced project managers facilitated smooth coordination among stakeholders and kept communication transparent throughout the process.

Upon commissioning, the new water treatment plant significantly improved water reliability and quality for Goodman Fielder’s manufacturing processes. The plant now provides a sustainable and cost-effective solution that supports both productivity and environmental responsibility. Thanks to Kaicolo Consultancy’s expert oversight and tailored project delivery, Goodman Fielder now operates with enhanced water security and operational resilience. This project stands as a testament to Kaicolo’s capability in delivering large-scale infrastructure with technical excellence and a strong commitment to client outcomes.

you can dream, we can build

Vale Ni Vula

Vale Ni Vula

Home > Vale Ni Vula

Client

Vale Ni Vula

location

Suva, Fiji

budget

$100k

Vale Ni Vula Renovation

project preview

Kaicolo Consultancy recently undertook a comprehensive renovation project with the goal of transforming an outdated family home into a modern, stylish, and functional living space. The client’s vision was to breathe new life into the property while preserving its original structure. Kaicolo approached this challenge with a blend of creativity, technical expertise, and attention to detail—ensuring the final result aligned with contemporary design standards without losing the home’s unique character.

what we do

The renovation began with a complete interior redesign. Walls were removed or repositioned to create an open-plan layout that allowed for better flow and natural light. The color scheme was updated to include neutral tones, creating a clean and calming atmosphere. Modern fittings, smart lighting, and energy-efficient appliances were installed throughout, making the home not only beautiful but also more practical and sustainable for daily living.

Planning

Create new floor plans

managing

Liaising with contractors

On the exterior, Kaicolo Consultancy gave the house a striking new look. Outdated finishes and materials were replaced with sleek, modern alternatives such as composite cladding, aluminium-framed windows, and minimalist landscaping.

The entrance was redesigned to enhance curb appeal, while outdoor living spaces—like a new patio and garden area—were added to create a seamless connection between indoor and outdoor life.

Throughout the project, Kaicolo worked closely with the client to ensure every design element reflected their taste and lifestyle. The renovation was completed on time and within budget, showcasing Kaicolo’s commitment to quality craftsmanship and client satisfaction. The end result is a home that feels fresh, modern, and thoughtfully designed—a true reflection of the consultancy’s high standards and innovative approach to renovation.

you can dream, we can build

Apartment Renovation

Apartment Renovation

Home > Apartment Renovation

Client

Stephen & Liz

location

Suva, Fiji

budget

$20k

City Apartment Renovation

project preview

Kaicolo Consultancy recently completed the successful renovation of a two-bedroom apartment designed specifically for short-term rental on Airbnb. The project aimed to transform a dated and underutilized space into a stylish, functional, and welcoming home-away-from-home for travelers. The client’s vision was to create an environment that offered both comfort and aesthetic appeal, aligned with Airbnb’s competitive market expectations. Kaicolo Consultancy was responsible for end-to-end project management, from concept development and space planning to sourcing materials and overseeing construction.

what we do

The renovation involved a complete overhaul of the apartment’s interior layout and finishes. Walls were repainted in soft, neutral tones to enhance natural lighting and create a sense of spaciousness. Modern light fixtures, vinyl plank flooring, and high-quality furnishings were carefully selected to ensure durability and appeal to a wide range of guests.

Planning

Create new floor plans

managing

Liaising with contractors

Both bedrooms were designed with simplicity and comfort in mind—featuring queen-sized beds, blackout curtains, and ample storage—while the living room was styled to balance relaxation and functionality, complete with a smart TV and contemporary seating.

The kitchen and bathroom also underwent significant upgrades to meet the needs of modern travelers. The kitchen was fitted with energy-efficient appliances, new cabinetry, a breakfast bar, and essential cookware, enabling guests to prepare meals during their stay. The bathroom was re-tiled and equipped with a rainfall shower, sleek vanity, and premium fittings to deliver a boutique-hotel experience within a cozy residential setting. These improvements not only elevated the apartment’s market appeal but also ensured it would stand out in Airbnb listings for its blend of practicality and charm.

Throughout the renovation process, Kaicolo Consultancy worked closely with contractors, designers, and the property owner to ensure the project was delivered on time and within budget. Special attention was given to Airbnb-specific details such as ease of check-in, durable finishes for high guest turnover, and design features that photograph well for online listings. The result is a beautifully renovated, fully equipped two-bedroom apartment ready to welcome guests and generate consistent rental income for the client. This project is a reflection of Kaicolo Consultancy’s commitment to delivering thoughtful, high-impact property transformations tailored to short-term rental success.

you can dream, we can build

Goodman Fielder Cone Room​

Cone Room

Home > Cone Room

Client

Goodman Fielder

location

Suva, Fiji

budget

$2M

Goodman Fielder Cone Room

project preview

Kaicolo Consultancy proudly led the planning, construction, and successful installation of a fully functional cone production room equipped with advanced ventilation systems. This project was commissioned to meet the growing demand for efficient and hygienic production environments, particularly in sectors requiring precision, safety, and air quality control. Kaicolo’s role covered end-to-end project management, from needs assessment and design development to execution and final handover.

what we do

The project began with a comprehensive site evaluation and consultation with stakeholders to understand the technical and operational needs of the cone production process.

Planning

Create floor plans

managing

Liaising with contractors

Kaicolo’s design team developed tailored blueprints that accounted for workflow efficiency, temperature regulation, and contamination control. Special attention was paid to airflow direction, material durability, and spatial layout to ensure that the production area would comply with safety and industry standards.

Installation of the cone production room was carried out by a skilled team of contractors and engineers under Kaicolo’s supervision. High-performance exhaust and intake ventilation systems were integrated into the structure to maintain a consistent, clean, and well-regulated air environment. Throughout the construction phase, Kaicolo applied strict quality assurance practices, ensuring that all installations met regulatory requirements and exceeded client expectations.

Upon completion, Kaicolo conducted a full systems test, including ventilation flow rate analysis and production line dry runs, to verify the functionality and readiness of the facility. Training was also provided to on-site staff to operate and maintain the new systems effectively. The result is a modern, efficient, and safe cone production space that supports increased productivity and enhanced working conditions—another testament to Kaicolo Consultancy’s commitment to delivering reliable and high-quality industrial solutions.

you can dream, we can build

Blog Post Title

What goes into a blog post? Helpful, industry-specific content that: 1) gives readers a useful takeaway, and 2) shows you’re an industry expert.

Use your company’s blog posts to opine on current industry topics, humanize your company, and show how your products and services can help people.